Bills Of Materials Setup Document with Costing

Introduction:

A bill of materials (BOM) is an extensive list of raw materials, components, and assemblies required to construct, manufacture, or repair a product or service. A bill of materials usually appears in a hierarchical format, with the highest level displaying the finished product and the bottom level showing individual components and materials.

 

STEP 1: CREATE LOCATIONS

Define the manufacturing Location

Responsibility: Bills of Materials Navigation: Setup  > Locations

STEP 2: CREATE CALENDAR

Define the manufacturing Calendar

Responsibility: Bills of Materials Navigation: Setup > Calendars

Define Workday Pattern, Shifts & Timings:

Build Calendar:

STEP 3: CREATE MANUFACTURING ORGANIZATION

Responsibility: Inventory Navigation: Setup > Organizations > Organizations

Enter Accounting Information:

Enter Inventory Information:

Create a Standard Costing Organization and assign the manufacturing calendar and enter all the required GL Code combinations in accounts fields.

Enter Receiving Information:


STEP 4: CREATE MATERIAL SUB-ELEMENTS

Responsibility: Inventory Navigation: Setup > Costs > Sub-Elements > Materials

STEP 5: DEFINE SUB-INVENTORY

Responsibility: Inventory Navigation: Setup > Organizations > Sub-inventories

Create the below sub-inventories under the newly created manufacturing organization

STEP 6: DEFINE BOM PARAMETERS

Responsibility: Bills Of Materials Navigation: Setup > Parameters

Note:

If you have not defined the BOM Parameters then you will get the below error message while opening the Bills form

STEP 7: DEFINE EXCEPTION TEMPLATES

Responsibility: Bills Of Material Navigation: Setup > Calendar OR Exception Templates

Query the Manufacturing “Calendar” and click on “Dates

As per the manufacturing calendar, all Sundays are leave. In case of any business requirement if you would like to make some Sundays as a working day then you can define the Exception Templates and enter those days as a working days

Click on “Exception List

Click “OK

As soon as you save the Exception List, it will reflect in your calendar

STEP 8: DEFINE RESOURCES

Responsibility: Bills of Materials Navigation: Routing > Resources

Define one Assembly Machine Resource with Charge Type as “WIP Move

Define Resource Rates:

After enabling the “Costed” and “Standard Rate” check boxes, click on “Rates

Save and close this form.

Likewise create one Assembly Person Resource with Charge Type as “WIP Move

Click on “Rates

Note:

1. Defined the below Resources

Resource Name

Description

Type

UOM

Charge Type

Rate

DYN_A_MCHN

DYN Assembly Machine

Machine

HR

WIP Move

200

DYN_A_LBR

DYN Assembly Labour

Person

HR

WIP Move

75

DYN_HELPER

DYN Helper

Person

HR

WIP Move

50

DYN_TESTER

DYN Tester

Person

HR

WIP Move

100

2. Various Resource Types:

  • Amount – We can use this type when we use money transactions

  • Currency – We can use this type when we use USD currency for transactions.

  • Machine – We can use this type when the resource is a Machine

  • Miscellaneous – We can use this type during OSP or other transactions

  • Person – We can use this type when the resource is a Human/Person

3. Various Charge Types:

  • Manual – Charges will trigger when we manually move the Resources in Jobs

  • PO Receipt – Charges will trigger when we do PO Receipts for OSP Purchase Orders

  • PO Move – Charges will trigger when we complete the PO Receipts and do Move Transactions in OSP Operation

  • WIP Move – Charge will trigger when we do the Move Transactions in Discrete Jobs

4. When defining the Rates for Resources, we should define the rates using “Pending” Cost Types. Because this is a Standard Costing Organization.

STEP 9: DEFINE DEPARTMENT CLASSES

You can define department classes to group departments and to identify manufacturing cells. This information is for your reference only.

Responsibility: Bills Of Materials Navigation: Setup > Department Classes

Enter the Department Classes and it’s Description

STEP 10: DEFINE DEPARTMENTS

You can define departments as areas within your organization where you perform work and/or collect costs.
Responsibility: Bills of Materials Navigation: Routings > Departments

Enter the Department Name and Description along with the Department Class

Assign Resources to department:

Click on “Resources

Attached two resources for the Department “Assembly

If you want to enter the Overhead Rates for this Department then you can click on Rates and enter the Amount

Create a Department for Painting and Assign the Resource

Click on “Resources

Define one more department for QC and assign the resource

Note:

All the department resources are available for 24 Hours. If that department resource is not available for 24 hours then uncheck “Available 24 Hours” check box and enter the timing in “Shifts”

STEP 11: DEFINE STANDARD OPERATIONS

Responsibility: Bills Of Materials Navigation: Routing > Standard Operations

Enter the Standard Operations Code and attach the Department

Assign Resources to Standard Operations:

Click on “Operation Resources” and assign the Resources

Usage & Inverse: If we use the Resource “DYN_A_MCHN” for half an hour (Usage) then we can produce 1 unit (Inverse). Otherwise, if we want 2 Units output then we need to use the resource “DYN_A_MCHN” for 1 hour. At the same time, if we use the resource “DYN_A_LBR” for 1 hour then we will produce 1 Unit.

Likewise create the Standard Operations for Painting

Create on Standard Operation for Quality Checking

Note:

We should use the Painting resource for 2 hours to produce 1 unit. In other words, the painting resource can produce only half unit in 1 hour.

Similarly the tester resource can produce 1 unit in 1 hour.

Usage: How many hours we should use one particular resource to produce 1 Unit?

Inverse: What is the Output of one resource if we use that resource for 1 hour?

STEP 12: CREATE ITEMS

Create the below items and apply the proper item templates and then assign the cost.

Items

Template

Cost

DYN_CAR

Finished Goods

DYN_Engine

Purchased Item

500

DYN_Chasis

Purchased Item

400

DYN_Seat

Purchased Item

75

DYN_Wheel

Sub-Assembly

DYN_Tyre

Purchased Item

25

DYN_Rim

Purchased Item

30

DYN_Axle

Purchased Item

20

Responsibility: Inventory Navigation: Items > Master Items

STEP 13: ENTER ITEM COST

Responsibility: Inventory Navigation: Costs > Item Costs

Click on “New” and enter the Item Code and Cost Type as “Pending

Click on “Open” and then “Costs

Likewise enter the costs for remaining items

If you query these items again then, we can see one more record for each and every item in “Frozen” cost type

Note:

For every item will have 2 records. One record will be in “Pending” Cost Type and the another one will be in “Frozen” cost type. Because, this DYN Organization is a Standard Cost Organization. By default the item cost will be defined in “Pending” cost type. Then if we run the “Update Standard Cost” program then the cost will be moved to “Frozen” Cost Type.

STEP 14: DEFINE OVERHEADS

Responsibility: Inventory Navigation: Setup > Costs > Sub-Elements > Overheads

Enter the Overhead Name and select the Cost Element then enter the Overhead Absorption Account

Assign Overhead department and overhead Rates:

Click on “Rates” and enter the Overhead Amount

While entering the Overhead Rates, we need to enter the Department Name as well.

Basis = Item

Means, this Overhead Rate will be based on the item. Whenever we are using the Department “DYN_QC” this Overhead rate 125 USD will be applied.

assign Overhead Resources:

Click on “Resources” and assign that Resource (Whatever the Department you have assigned, assign that department resource to this Overhead.

STEP 15: DEFINE ROUTING

Responsibility: Bills Of Material Navigation: Routings > Routings

Select the Organization as “DYN” and create the Routings for both the Assembly items

First create the Routings for the Sub-Assembly item ” DYN_Wheel

Likewise create the Routings for the End Assembly item “DYN_CAR

STEP 16: DEFINE BILLS

Responsibility: Bills Of Materials Navigation: Bills > Bills

First, create the Bills for Sub-Assembly item and then create the Bills for Main Assembly Item

Make it the Supply Type as “Push

Create Common Bills:

This Bill was created in “DYN” organization and it’s a manufacturing org. So, we need to create the Bill in Master Organization as well. To create the Common Bill in Master Org, navigate to

Tools > Create Common Bills

Enter the Master Organization and the item

Click on “OK

Create Common Bills” program will be submitted automatically

Query this Bill in Master Org “DMO” and it will be available

This completes the Bill Of Materials

STEP 17: UPDATE STANDARD COST:

Responsibility: Inventory Navigation: Costs > Standard Cost Update > Update Costs

Run the “Update Standard Costs” program for “Pending” Cost Type

“Submit” the ” Update Standard Costs” program in DYN Organization

Note:

Make sure the Inventory Period is open for our organization “DYN”


STEP 18: RUN COST ROLL-UP

Responsibility: Cost Management SLA

Navigation: Supply Chain Costing > Supply Chain Cost Rollup

Submit a single request “Supply Chain Cost Rollup – Print Report

Check the Output for “Supply Chain Cost Rollup – Print Report

Item Roll-up Cost for “DYN_CAR”

STEP 19: COST ROLL-UP CALCULATION:

Material Cost:

Items

Template

Item Cost

Qty Required

Material Cost

DYN_CAR

Finished Goods

1

1385

DYN_Engine

Purchased Item

500

1

500

DYN_Chasis

Purchased Item

400

1

400

DYN_Seat

Purchased Item

75

3

225

DYN_Wheel

Sub-Assembly

1

260

DYN_Tyre

Purchased Item

25

4

100

DYN_Rim

Purchased Item

30

4

120

DYN_Axle

Purchased Item

20

2

40

Resource Cost:

Resource Name

Type

Item

UOM

Charge Type

Usage

Inverse

Rate

Total Amount

DYN_A_MCHN

Machine

DYN_CAR

HR

WIP Move

0.5

2

200

100

DYN_A_LBR

Person

HR

WIP Move

1

1

75

75

DYN_HELPER

Person

HR

WIP Move

2

0.5

50

100

DYN_TESTER

Person

HR

WIP Move

1

1

100

100

DYN_A_MCHN

Machine

DYN_Wheel

HR

WIP Move

0.5

2

200

100

DYN_A_LBR

Person

HR

WIP Move

1

1

75

75

Total Resource Cost

550

Overhead Cost:

Name

Department

Resources

Rate

DYN_OVRHED

DYN_QC

DYN_TESTER

125

Roll-up Cost for Item “DYN_Wheel”

  • Material Cost: 260

  • Resource Cost: 175

  • Overhead Cost: 0

Total Cost: 260 + 175 = 435

Roll-up Cost for Item “DYN_CAR”

  • Material Cost: 1385

  • Resource Cost: 100 + 75 + 100 + 100 + 175 = 550

  • Overhead Cost: 125

Total Cost: 1385 + 550 + 125 = 2060 USD

Summary

This post explains about Bills Of Materials Setup Document with Costing.